This 5,000 SF project was built for the Jamestown Tribe, and had a very tight fast-track schedule as there was a fixed date for the Grand Opening. First, the unstable soils on the site had to be removed and replaced with structural fill. Then, all highly detailed interior components and finishes were developed during the structural construction phase working closely with the Architect, the Jamestown Tribe CEO, and the Owner Representative. Logs for the structure were sourced locally and kiln dried to prevent shrinkage. The interior entryway is poured concrete with exposed aggregate and topped with turquoise and onyx pebbles. The floors are hand-scraped hickory and the cabinetry is cherry. Tribal artisans created the vertical exterior entry panels and the masks for the entry railings and log ends. We also designed and built the interior entry water feature. The project was completed in seven months in time for the planned Grand Opening.